Page views this IP this session = 1 of 10 unsubscribed pagesEast Anglia 1 Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Subscribers see an interactive map with East Anglia 1 Wind Farm and local projects displayed.
( Subscribe for £100 )to have full access to all Wind projects and details.
Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm
Subscribe for £500 to include full csv and KML downloads of all Wind project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
East Anglia 1 Wind Farm (Wind , Active) Location in the UK : England, Lowestoft Type of installation: Wind on/offshore: off Turbines :102 Capacity : 714 MW Approx Date of 1st power generation: August 2020
Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Feb 2015 CfD auction: One of the two successful offshore wind projects was ScottishPower Renewables’s East Anglia 1 farm off the Suffolk coast. It will get a contract for 714 MW of capacity.
The initial plans were for the project to install up to 325 offshore turbines in a 300 kilometre square zone over 43 kilometres off the coast, delivering around 1.2GW of capacity.
However, the use of larger turbines means that the project will now see up to 240 turbines installed, while still delivering the expected 1.2GW of capacity.
ScottishPower Renewables has connected the East Anglia ONE offshore wind farm to the UK’s electricity grid. With a capacity of 714MW, the windfarm will be fully operational and producing clean, renewable energy in 2020. For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation Subscriber Register
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
East Anglia 1 (EA 1) 714 MW
|
Energy Type: |
Wind Offshore |
County: |
Offshore Country: England LPA: The Planning Inspectorate - National Infrastructure
|
Site ID and Reference: |
2524 / B0262
District:
|
Applicant: |
Scottish Power Renewables
Application :
ENO10025
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
102 |
Turbine Capacity: |
7 |
Height of Turbines: |
|
Calculated capacity: |
714 |
Site Address: |
Offshore, East of England
|
|
NR32
|
County: |
Offshore Region: Offshore
|
OS Coordinates: |
685500 / 685500
|
Development Status: |
Operational
|
Application Submitted: |
11/21/2012
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
5/24/2018
|
|
|
Generator Live |
7/28/2020
|
This Record Last Updated: |
8/20/2020
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
|
Generator Type: |
|
Scheme : |
|
Generator ID: |
|
Capacity: |
|
Status: |
|
Accreditation Date: |
11/21/2012
|
|
|
Commission Date: |
|
|
|
Applicant: |
|
Applicant Address: |
|
Address: |
|
Capacity: 728 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 5/4/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|